Nigeria’s first ever high speed train service will open for service in March 2016. It is the double-track, standard gauge between Abuja and Kaduna that runs at 120Km and 150 Km an hour. Come March, travelers will be able to journey from Abuja to Kaduna (and vice-versa) in less than an hour. The project which was just completed by the China Civil Engineering Construction Company (CCECC) cost $849 million. The Managing Director of the Nigerian Railway Corporation (NRC), Adeseyi Sijuwade while addressing the media in Lagos said “Next month, we’ll be taking delivery of modern coaches to run on the standard gauge line, specifically for the Abuja-Kaduna line, so that that service can commence immediately,” According to him, the corporation was looking at a February-March timeline to commence delivery of services. The rail project was supposedly completed in December 2014, but was never delivered. And even if the delivery is 15 months later than expected, it is good news that it finally works considering the fact that it has spanned nearly four administrations. Spanning from the Obasanjo administration to present, an active and efficient rail system has been marred for a long time by inefficiencies and corruption on a massive scale. As since the contract was awarded in the Obasanjo era, there has not been any positive move to see its fruition. Trains were originally designed to transport heavy duty goods like the goods ferried from the seaports on giant trailers that block and damage the road causing traffic gridlock. Some rail tracks have been rendered dysfunctional and unusable from the many years of being left idle. A working rail system is key to our messed up transportation system as roads would be eased off and traffic gridlocks become a thing of the past. The Lagos to Ibadan route was also commissioned in 2o1o with this Abuja-Kaduna route, as well as the Lagos to Calabar route. The government should also consider other routes that are frequently traveled and are heavily congested, like roads out of Lagos to other commercial hubs. The 186.5km standard gauge track was built by the China Railway Construction Corporation with double lines over a period of three years at the cost of $850m.
The route has nine stations and the train can travel at up to 150km per hour. “Next month, we’ll be taking delivery of modern coaches to run on the standard gauge line, specifically for the Abuja-Kaduna line, so that that service can commence immediately. We’re looking at February or March for the service to commence,” Sijuwade said. The Federal Government had previously approved a grant of N1.1bn for the purchase of two modern diesel/electric locomotives to run on the high speed new rail line. However, Sijuwade did not say if the two engines had been delivered by the contractors, Messrs CNR Locomotives and Rolling Stock Limited, and CCECC Nigeria Limited. According to media reports, the contract was for the design, manufacturing and launching of the locomotives with a capacity of 2,800 kilowatts for standard gauge tracks; the training of 30 NRC personnel on the operation and maintenance of the engines; test-running in Nigeria as well as a one-year maintenance and technical support with two resident technicians from the manufacturers.
No comments:
Post a Comment
Sharing is caring...